about

The company founded a factory in 2014, is located in one of China's economically developed Huangjiang Town, Dongguan City, Guangdong Province is a collection of product development and design, production, sales as one of the professional electronic connectors speed factory; product categories are mainly Wafer, Housing, Terminal, Header Connector, Wire Harnesses, Cable Our products are mainly Wafer, Housing, Terminal, Header Connector, Wire Harnesses, Cable/Flat Cable harnesses and cables. Widely used in automotive electronics, intelligent robots, home appliances and office equipment.

Server power supplies, military/aerospace, industrial automation, LED displays/lighting, medical, computers with communication and wireless devices...

More    +
10 year

Experience in manufacturing of electronic products

10000 +

Square foot production plant

200 +

Production, sales and technical staff

30 +

Country and area

SPECIALIZED HARNESSES, CONSISTENCY CONTROL

YEARS OF SPECIALIZING IN ELECTRONIC PRODUCTS INDUSTRY RESEARCH AND DEVELOPMENT MANUFACTURING, WELCOME TO BUY!

PROUDCT

CUSTOM SERVICES

  • COMMUNICATION INTENTION
  • PROVIDE A QUOTATION
  • PRODUCT SAMPLING
  • TECHNICAL COMMUNICATION
  • CONFIRM ORDER PLACEMENT
  • SIGNING CONTRACTS
  • PRODUCTION AND MANUFACTURING
  • PACKAGING DELIVERY
  •  

    INDUSTRY APPLICATION CASES

     

    TECHNOLOGICAL PROCESS

  • Distribution

    01

    Distribution
    Be careful not to scratch or scuff the surface of the wire. How to do FIFO?
  • Offline

    02

    Offline
    Cut the wire to the required length using a wire cutter. Requirements: Do not cut the surface of the wire; do not cut the copper wire; peeling length error is not allowed to exceed Wire surface; not allowed to cut off the copper wire; peeling length error is not allowed to exceed ± 1mm. - The quality requirements of the stripped head can reflect the quality control ability of a wiring harness factory. control ability
  • Crimping

    03

    Crimping
    Insert the cable strips into the terminals for crimping. Requirements for compliance with crimp gauge. -This is the efficiency bottleneck in wire harness production and also the quality bottleneck. On the terminal Crimping quality of the degree of attention, the strength of the measures taken, the effectiveness of the most outstanding reflects the quality control ability of a wire harness factory
  • Preassembly

    04

    Preassembly
    Some of the terminals need to be assembled with the connectors before going on the mains. That Some of the off-line assembly, those on-line assembly, very delicate, this link fully reflects the This link fully reflects the wiring harness factory's process design capabilities, if the pre-assembly part of the assembly of the lesser or assembly of the wire path is unreasonable will increase the workload of the total assembly personnel, slowing down the flow of the The speed of the assembly line will be slowed down. This has an important impact on the efficiency and production quality of the whole assembly line.
  • Final Assembly

    05

    Final Assembly
    According to the wiring harness drawing design assembly table board, design work equipment, material box. The size control, appearance, wrapping and wire card direction of the wire harness are all done in this assembly line. Each workstation assembly content and requirements need to be balanced to prevent the excessive workload at one point from pulling down the speed of the whole assembly line.
  • Conductivity Testing

    06

    Conductivity Testing
    In this process, it is the most likely to occur on the harness of human injury This process is the most prone to human damage to the wiring harness - damage to the terminals, damage to the wires at the end of the connector, damage to the tie wraps, and damage to the wires at the end of the connector. Changes in the position of the cable ties
  • QQ
  • Telephone
  • Home
  • Feedback